Aviation - Miami International Airport Concourse D-Extension Finishes

  • Aviation — Miami International Airport Concourse D-Extension Finishes
  • Aviation — Miami International Airport Concourse D-Extension Finishes
  • Aviation — Miami International Airport Concourse D-Extension Finishes
MORE MEDIA:
  • Aviation — Miami International Airport Concourse D-Extension Finishes
  • Aviation — Miami International Airport Concourse D-Extension Finishes
  • Aviation — Miami International Airport Concourse D-Extension Finishes
Owner: 
American Airlines
Design team: 
Harper Partners
Delivery method: 
Lump Sum, Hard Bid

This project covered a portion of the interior finishes for 12 new gates in Concourse D, consisting of the following: Construction of a 2,500 SF two story high impact wall system using Exterior Insulation Finish System along the existing D-16 Gate, on the subsequent demolition and driving piles to support the future building, already being constructed under a separate contract. Additionally construction of fire-rated partitions, insulation, installation of Metal and stainless steel doors and frames, with their respective hardware and installation of Skylights at the Automatic People Mover level, and installation of fir-rated louvers, stucco and painting.